
Field Operation
Mechanical Loading Sequence
01
02
03
Access Check
Skid Steer Loading
Scrape and Haul
We verify your gate width and driveway clearance before pulling the truck, track loader, and dump trailer directly to the bunker.
Our operator runs the compact track machine directly into the bunker, mechanically packing the hydraulic dump trailer to full payload.
We back-blade the pad clean to hard ground, secure the trailer load tarp, and handle all transit and agricultural disposal.
Operational Specs
Heavy Equipment Performance
14 Yd³
dump trailer payload per load
45 Min
average mechanical loading time
0 Hrs
manual shoveling by barn staff
Select your bunker volume, confirm gate clearance, and lock in an upcoming haul date on our route calendar.
